Services

Everything between the floor plan and the final room.

Six services and one team. Take the whole package, from first budget to handover, or bring us in for the part you need.

Most furniture problems are schedule problems. A late container, a wrong finish, a missing box on install day. We run the whole chain so nothing falls between vendors.

01 / Project planning & budgeting

A budget per room and a date you can trust.

We start on site. We count keys, beds or seats, measure the rooms that matter and look at the loading dock and the elevators. Then we set an FF&E budget and a schedule that works backward from your opening date.

  • Site visits and room counts
  • Budget per key, bed or seat
  • Schedule set from your opening date
  • Phasing for occupied renovations
02 / Interior design & specification

Rooms designed to be built, not just rendered.

Space plans, finish boards and renderings, drawn by people who also buy and ship the furniture. For franchised hotels we work to the brand standard, so your package passes review the first time.

  • Space plans and layouts
  • Finish and fabric boards
  • Renderings for owner and brand review
  • Brand-standard and PIP packages
Sapphire velvet headboard in a walnut wall with brass sconces
03 / Procurement & sourcing

The right maker for each piece, at the right price.

We bid every package across North American and overseas contract manufacturers, compare line by line, and value-engineer where guests will never notice. A prototype room is approved before the full order goes into production.

  • Competitive bids, line by line
  • Value engineering
  • Samples and a prototype room
  • Purchase orders, deposits and tracking
Walnut nightstand drawer with brass pull under a marble top
04 / Logistics & warehousing

Tracked from the factory floor to your floor.

Quality checks before anything ships. Freight consolidated, customs and duties cleared, goods received and stored until your building is ready. Then deliveries arrive floor by floor, in the order the installers need them.

  • Factory inspections
  • Freight, customs and duties
  • Receiving and secure storage
  • Floor-by-floor delivery windows
05 / Installation

Every piece placed to plan, and the boxes gone.

Our crews unload, assemble and place every item to the layout. Art, mirrors and lighting go up, packaging and debris go out, and each room is checked against the plan before we call it done.

  • Assembly and placement to plan
  • Art, mirrors and lighting hung
  • Packaging and debris removed
  • Room-by-room punch list
Brass swing-arm sconce mounted on a walnut headboard wall
06 / Project management

One name to call, from first budget to handover.

Every project gets one Lapis lead who owns the schedule, the budget and the answers. You get a short status report every week, so you know what is ordered, what has shipped and what is already in the room.

  • One named project lead
  • Weekly status reports
  • Budget tracked against plan
  • Handover file and reorder plan

Timing

A typical renovation, start to finish.

Every property is different, but the order of work is not. Custom upholstery, case goods and lighting often take 18 to 24 weeks to make before they even ship, so the earlier we start, the calmer your opening.

  1. Weeks 1 to 8

    Plan and design

    Site visit, budget, space plans, finishes and brand review.

  2. Weeks 6 to 14

    Bid and prototype

    Bids, value engineering and a prototype room for sign-off.

  3. Weeks 12 to 36

    Production

    Manufacturing with factory checks at key milestones.

  4. 4 to 6 weeks

    Freight

    Ocean or road freight, customs, receiving and storage.

  5. Days per floor

    Install and handover

    Floor-by-floor install, punch list and walkthrough.

For new builds and full renovations, call us 12 to 18 months before opening. For a smaller refresh, call as soon as you have a date and we will tell you honestly what is possible.

Questions

What owners ask us first.

How early should we bring you in?

For a new build or a full renovation, 12 to 18 months before opening is ideal. Custom pieces can take 18 to 24 weeks to make, plus freight. For a smaller refresh, call as soon as you have a date.

Is there a minimum project size?

No fixed minimum. We work on boutique properties with a few dozen rooms and on campus-scale projects. Tell us your scope and we will tell you plainly whether we are the right fit.

Can you work to our hotel brand's standards?

Yes. We build specification packages around your brand's standards and PIP requirements and prepare the submittals for brand review.

Can you work around guests in an occupied hotel?

Yes. We phase deliveries and installs floor by floor, so rooms go back into inventory quickly and guests barely notice we were there.

What about warranty and replacements?

Warranty terms follow each manufacturer and product, and we handle claims for you. We keep your specifications on file, so a replacement chair matches the original years later.

Start a project

Ready when your opening date is.